Pre-removal Operation - Fuel Line Pressure Reduction (Refer to GROUP 13A - On-vehicle Service, How to Reduce Pressurized Fuel Lines
). - Engine Room Under Cover Front A, B and Engine Room Side Cover (RH) Removal (Refer to GROUP 51 - Under Cover
). - Engine Coolant Draining (Refer to GROUP 14A - On-vehicle Service, Engine Coolant Change
). - Air Cleaner Intake Hose and Air Cleaner Assembly Removal (Refer to GROUP 15 - Air Cleaner
). - Ignition Coil Removal (Refer to GROUP 16 - Ignition System, Ignition Coil
). - Exhaust Manifold Removal (Refer to GROUP 15 - Exhaust Manifold
). - Throttle Body Assembly Removal (Refer to GROUP 13A - Throttle Body Assembly
). - Thermostat Housing Removal (Refer to GROUP 14A - Water Hose and Water Pipe
).
| Post-installation Operation - Thermostat Housing Installation (Refer to GROUP 14A - Water Hose and Water Pipe
). - Throttle Body Assembly Installation (Refer to GROUP 13A - Throttle Body Assembly
). - Exhaust Manifold Installation (Refer to GROUP 15 - Exhaust Manifold
). - Ignition Coil Installation (Refer to GROUP 16 - Ignition System, Ignition Coil
). - Air Cleaner Intake Hose and Air Cleaner Assembly Installation (Refer to GROUP 15 - Air Cleaner
). - Engine Coolant Refilling (Refer to GROUP 14A - On-vehicle Service, Engine Coolant Change
). - Engine Room Under Cover Front A, B and Engine Room Side Cover (RH) Installation (Refer to GROUP 51 - Under Cover
). - Fuel Leak Check.
|