[Previous][Next]
Work Procedure
1.DISTANCE SENSOR CONFIGURATION
Perform the distance sensor configuration with M.U.T.-III SE. Refer to Work Procedure.
:
 
2.PERFORM RADAR ALIGNMENT
Perform the radar alignment. Refer to Work Procedure.
:
 
3.AEB SYSTEM ACTION TEST
  1. Perform the following system action test.
  2. Check that the each system operates normally.
: INSPECTION END