Pre-removal and Post-installation operation - Engine Room Under Cover Front A, B and Engine Room Side Cover (LH) Removal and Installation (Refer to GROUP 51 -Under Cover 
 ). - Battery and Battery Tray Removal and Installation (Refer to GROUP 54A - Battery 
 ). - Relay Box Mounting Bolts Removal and Installation.
 - Air Cleaner Assembly Removal and Installation (Refer to GROUP 15 - Air Cleaner 
 ). - Engine Control Module (ECM) and Bracket Removal and Installation (Refer to GROUP 13A - Engine Control Module (ECM) 
  <2.0L Engine> or GROUP 13C - Engine Control Module (ECM)   <2.4L Engine>). 
  |