Pre-removal and post-installation operation - Air cleaner cover removal and installation (Refer to GROUP 15 - Air Cleaner
). - Engine coolant draining and refilling (Refer to GROUP 14A - On-vehicle Service
). - Throttle body water feed hose disconnection and connection (Refer to GROUP 13A - Throttle Body Assembly
). - Radiator upper hose and lower hose disconnection and connection (Refer to GROUP 14A - Radiator
).
|