[Previous][Next]
REMOVAL AND INSTALLATION
 
 
Pre-removal Operation
  • Front Bumper Assembly Removal (Refer to GROUP 51- Front Bumper Assembly ).
  • Front Bumper Reinforcement A Removal (Refer to GROUP 42A - Loose panel ).
Post-installation Operation
  • Front Bumper Reinforcement A Installation (Refer to GROUP 42A - Loose panel ).
  • Front Bumper Assembly Installation (Refer to GROUP 51 - Front Bumper Assembly ).
  • Headlight Aiming Adjustment (Refer to ).
Removal Steps
>>A<<1.Headlight assembly
2.Grommet
 
 
INSTALLATION SERVICE POINT
 
 
>>A<< HEADLIGHT ASSEMBLY INSTALLATION
Tighten the mounting screw and bolts to the specified torque in the order shown.
Tightening torque:
  • Screw (1): 1.5 ± 0.3 N·m (13 ± 2 in-lb)
  • Bolt (2 to 5): 4.5 ± 1.5 N·m (40 ± 13 in-lb)