[Previous][Next]
REMOVAL AND INSTALLATION
 
 
Pre-removal and post-installation operation
  • Crankshaft Pulley Removal and Installation (Refer to ).
  • Generator Assembly Removal and Installation (Refer to GROUP 16, Charging System, Generator Assembly ).
  • Water Pump Removal and Installation (Refer to GROUP 14, Water Pump ).
  • Cylinder Head Cover Assembly Removal and Installation (Refer to ).
Removal steps
1.Oil dipstick assembly
2.O-ring
Oil pan (Refer to ).
<<A>>>>B<<Engine mounting insulator (Refer to GROUP 32 - Engine Mounting ).
<<B>>>>A<<3.Timing chain case assembly
4.O-ring
Required Special Tools:
 
 
REMOVAL SERVICE POINTS
 
 
<<A>> ENGINE MOUNTING INSULATOR REMOVAL
1. Secure the engine hanger special tool (MB991928 or MB991895) for holding the engine assembly (Refer to GROUP 22A, Transaxle Assembly ) <M/T> or (Refer to GROUP 23A, Transaxle Assembly ) <CVT>.
2. Adjust the engine hanger special tool (MB991928 or MB991895) not to allow the weight of the engine assembly to rest on the engine mounting insulator. Then remove the engine mounting insulator.
 
 
 
<<B>> TIMING CHAIN CASE ASSEMBLY REMOVAL
Remove the timing chain case assembly from above the vehicle.
 
 
 
 
INSTALLATION SERVICE POINTS
 
 
>>A<< TIMING CHAIN CASE ASSEMBLY INSTALLATION
For the installation procedure, refer to GROUP 11B, Oil Pan and Timing Chain Case .
 
 
 
>>B<< ENGINE MOUNTING INSULATOR INSTALLATION
Use the engine hanger special tool (MB991928 or MB991895) as during removal to install the engine mounting insulator.