[Previous][Next]
REMOVAL AND INSTALLATION
 
 
Removal steps
1.Propeller shaft assembly (Refer to GROUP 25 - Propeller Shaft .)
2.Cover
3.Breather hose connection
4.Connector connection
5.Bracket
A6.Electronic control coupling
7.Washer
 
 
 
INSTALLATION SERVICE POINT
 
 
>>A<< ELECTRONIC CONTROL COUPLING INSTALLATION
1. Check that the length of the electronic control coupling stud bolt (A) is within the standard value range.
Standard value: 22.3 - 25.1 mm (0.88 - 0.99 inch)
2. If it exceeds either of the limits, clean the threads for the electronic control coupling and replace the stud bolt.
Tightening torque: 15 ± 3 N·m (11 ± 2 ft-lb)