Pre-removal Operation - Engine Coolant Draining (Refer to 
 ). - Engine Upper Cover Removal (Refer to GROUP 11A, Camshaft 
 ). <2.0L ENGINE> - Engine Upper Cover Removal (Refer to GROUP 11C, Camshaft 
 ). <2.4L ENGINE> - Air Cleaner Assembly Removal (Refer to GROUP 15, Air Cleaner 
 ). 
  | Post-installation Operation - Air Cleaner Assembly Installation (Refer to GROUP 15, Air Cleaner 
 ). - Engine Upper Cover Installation (Refer to GROUP 11A, Camshaft 
 ). <2.0L ENGINE> - Engine Upper Cover Installation (Refer to GROUP 11C, Camshaft 
 ). <2.4L ENGINE> - Engine Coolant Refilling (Refer to 
 ). 
  |