STEP 4. Resistance measurement at main drive lithium-ion battery harness.
(1) Disassemble the main drive lithium-ion battery.
(2) Check at the main drive lithium-ion battery wiring harness without disconnecting the service plug assembly and the main drive lithium-ion battery wiring harness.
(3) Measure the resistance between the main drive lithium-ion battery wiring harness connector (terminals No.1 and No.2).OK:
- Service plug is inserted: Continuity exists (2 Ω or less)
- Service plug is not inserted: No continuity
Is the check result normal?
Go to Step 5. Replace the service plug (Refer to ).