STEP 1. Door-ajar switch inspection
STEP 2. Resistance measurement at liftgate latch connector (door-ajar switch ground line terminal).
(1) Disconnect the connector, and measure at the wiring harness side.
(2) Measure the resistance between liftgate latch connector (door-ajar switch ground line terminal) and body ground.OK: Continuity exists (2 Ω or less).
Is the check result normal?
Go to Step 4. Go to Step 3.
STEP 3. Check of open circuit in ground line between liftgate latch connector (door-ajar switch terminal) and body ground.
STEP 4. Check of open circuit in LTH line between power liftgate control unit connector and liftgate latch connector.
STEP 5. Check of the troubles
STEP 6. After the replacement of liftgate latch, recheck of the troubles.
(1) Replace the liftgate latch.
(2) Check that the door-ajar switch signal is received normally.
Is the check result normal?
The procedure is complete. Replace the power liftgate control unit.