REMOVAL AND INSTALLATION
Removal steps
1.
Propeller shaft assembly (Refer to GROUP 25 - Propeller Shaft
).
2.
Cover
3.
Breather hose connection
4.
Connector connection
5.
Bracket
>>A<<
6.
Electronic control coupling
7.
Wave washer
INSTALLATION SERVICE POINT
>>A<< ELECTRONIC CONTROL COUPLING INSTALLATION
1.
Check that the length of the electronic control coupling stud bolt (A) is within the standard value range.
Standard value: 21.6 - 24.4 mm (0.86 - 0.96 inch)
2.
If it exceeds either of the limits, clean the threads for the electronic control coupling and replace the stud bolt.
Tightening torque: 13 ± 2 N·m (115 ± 17 in-lb)