[Previous][Next]
REMOVAL AND INSTALLATION
 
 
Pre-removal and Post-installation Operations
  • Instrument Panel Side Cover (RH) Removal and Installation (Refer to GROUP 52A - Instrument Panel Assembly ).
  • Glovebox and Instrument Panel Under Cover Assembly Removal and Installation (Refer to GROUP 52A - Glove Box ).
  • Cowl Side Trim Removal and Installation (Refer to GROUP 52A - Trims, Interior Trim ).
Removal steps
1.Gateway-ECU (for TCU) sub wiring harness
2.Gateway-ECU (for TCU)