STEP 2. Voltage measurement at TCM connector (SPWR terminal).
(1) Connect the CVT assembly connector and the TCM connector.
(2) Turn the ignition switch to the "LOCK" (OFF) position.
(3) Measure the TCM connector side by backprobing.
(4) Measure the voltage between the TCM connector SPWR terminal and body ground.OK: 0 V
Is the check result normal?
Go to Step 3. Repair the connector(s) or the wiring harness.