[Previous][Next]
REMOVAL AND INSTALLATION
 
 
Pre-removal operation
  • Engine Room Under Cover Front B Removal (Refer to GROUP 51 - Under Cover ).
  • Transmission Fluid Draining (Refer to ).
  • Transfer Oil Draining (Refer to ).
  • Propeller Shaft Removal (Refer to GROUP 25 - Propeller Shaft ).
  • Drive Shaft <LH, RH> Removal (Refer to GROUP 26 - Drive Shaft Assembly ).
Post-installation operation
  • Drive Shaft <LH, RH> Installation (Refer to GROUP 26 - Drive Shaft Assembly ).
  • Propeller Shaft Installation (Refer to GROUP 25 - Propeller Shaft ).
  • Transfer Oil Refilling (Refer to ).
  • Transfer Oil Check (Refer to ).
  • Transmission Fluid Refilling (Refer to ).
  • Transmission Fluid Check (Refer to ).
  • Engine Room Under Cover Front B Installation (Refer to GROUP 51 - Under Cover ).
Removal steps
1.Dynamic damper
<<A>>2.Transfer assembly
3.O-ring
 
 
REMOVAL SERVICE POINT
 
 
<<A>> TRANSFER ASSEMBLY REMOVAL
Move the engine and transaxle assembly toward the front of the vehicle to make a gap between the engine/transaxle assembly and the crossmember. Pull out the transfer assembly through this gap.