STEP 3. Voltage measurement at TCM connector (LPRS terminal).
(1) Connect the TCM connector.
(2) Drive the vehicle until the engine is warmed up.
(3) Transmission range: "P" range
(4) Engine: Idling
(5) Measure the TCM connector side by backprobing.
(6) Measure the voltage between the TCM connector (LPRS terminal) and TCM connector (SGND terminal).OK: approximately 0.84 V
Is the check result normal?
Go to Step 4. Refer to DTC P0842: Secondary Pressure Sensor (low voltage) , or DTC P0843: Secondary Pressure Sensor (high voltage) .