[Previous][Next]
Work Procedure
×: Required
Parts nameWorkAdditional serviceRemarks
ReplacementRemoval
combination meter×ConfigurationThe combination meter do not operate normally unless the additional services are performed.
caution
  • Use “Manual Configuration” only when “Parts number” of combination meter cannot be read.
  • If an error occurs during configuration, start over from the beginning.
1.CHECKING PARTS NUMBER
WITH M.U.T.-III SE
  1. Select “Before Replace ECU” of “Read/Write Configuration”.
  2. Check that “Parts number” is displayed on M.U.T.-III SE.
Is “Parts number” displayed?
.
.
 
2.VERIFYING PARTS NUMBER (1)
WITH M.U.T.-III SE
Compare a “Parts number” displayed on the M.U.T.-III SE screen with the one searched by using EPC (service parts catalog) to check that these “Parts number” agree with each other.
noteFor the “Parts number” searched by using EPC (service parts catalog), use the last five digits of the “Parts number”.
: .
 
3.SAVING PARTS NUMBER
WITH M.U.T.-III SE
Save “Parts number” on M.U.T.-III SE.
: .
 
4.REPLACE COMBINATION METER (1)
Replace combination meter. Refer to Removal and Installation.
: .
 
5.WRITING (AUTOMATIC WRITING)
WITH M.U.T.-III SE
  1. Select “After Replace ECU” of “Re/programming, Configuration” or that of “Read / Write Configuration”.
  2. Select the “Parts number” agreeing with the one stored on M.U.T.-III SE and the one searched by using EPC (service parts catalog) to write the “Parts number” into the combination meter.
: .
 
6.REPLACE COMBINATION METER (2)
Replace combination meter. Refer to Removal and Installation.
: .
 
7.WRITING (MANUAL WRITING)
WITH M.U.T.-III SE
  1. Select “Manual Configuration”.
  2. Select the “Parts number” searched by using EPC (service parts catalog) to write the “Parts number” into the combination meter.
    noteFor the “Parts number” searched by using EPC (service parts catalog), use the last five digits of the “Parts number”.
: .
 
8.VERIFYING PARTS NUMBER (2)
WITH M.U.T.-III SE
Compare a “Parts number” displayed on the M.U.T.-III SE screen with the one searched by using EPC (service parts catalog) to check that these “Parts number” agree with each other.
noteFor the “Parts number” searched by using EPC (service parts catalog), use the last five digits of the “Parts number”.
: .
 
9.OPERATION CHECK
Confirm that each function controlled by combination meter operates normally.
: WORK END