REMOVAL AND INSTALLATION
Pre-removal and post-installation operation
Engine Room Under Cover and Engine Room Side Cover Removal and Installation (Refer to GROUP 51, Under Cover
).
Transmission Fluid Draining and Refilling (Refer to
) <Vehicles with Air-cooled Transmission Fluid Cooler>.
Engine Coolant Draining and Refilling (Refer to GROUP 14, On-vehicle Service
).
Air Cleaner Assembly and Air Cleaner Bracket Removal and Installation (Refer to GROUP 15, Air Cleaner
).
Battery and Battery Tray Removal and Installation (Refer to GROUP 54A, Battery
.)
Transmission fluid cooler line removal steps
1.
Water feed hose B
2.
Water feed hose A
3.
Hose joint assembly
4.
Water return hose
Air-cooled transmission fluid cooler removal steps <Vehicles with air-cooled transmission fluid cooler>
5.
Air-cooled transmission fluid cooler hose assembly
6.
Air-cooled transmission fluid cooler bracket A
7.
Air-cooled transmission fluid cooler bracket B
8.
Air-cooled transmission fluid cooler assembly