RELAY CHECK
BLOWER RELAY CONTINUITY CHECK
Battery voltage
Checking terminal
Normal condition
Not applied
3 - 4
No continuity
Connect terminal 1 to the positive battery terminal
Connect terminal 2 to the negative battery terminal
Continuity exists (2 Ω or less)
A/C PIPING SOLENOID VALVE RELAY CONTINUITY CHECK
Battery voltage
Checking terminal
Normal condition
Not applied
3 - 4
No continuity
Connect terminal 1 to the positive battery terminal
Connect terminal 2 to the negative battery terminal
Continuity exists (2 Ω or less)
HEATER WATER PUMP RELAY CONTINUITY CHECK
Battery voltage
Checking terminal
Normal condition
Not applied
3 - 4
No continuity
Connect terminal 1 to the positive battery terminal
Connect terminal 2 to the negative battery terminal
Continuity exists (2 Ω or less)