Post-installation Operation - Generator and Others Belt Installation (Refer to GROUP 11A - Crankshaft Pulley
). - Generator and Others Belt Tension Check (Refer to GROUP 11A - On-vehicle Service, Drive Belt Tension Check and Adjustment
). - Engine Coolant Refilling (Refer to
).
|