Diagnosis Procedure
1.
CHECK FUSE AND FUSIBLE LINK
Electric motor switch is OFF.
Check that the following IPDM E/R fuse and fusible link is not blown (open).
Signal name
Fuse and Fusible link No.
Battery power supply
32 (30A)
Ignition power supply
85 (20A)
Is the fuse and fusible link blown (open)?
Replace the blown (open) fuse or fusible link after repairing the affected circuit if a fuse or fusible link is blown (open).
.
2.
CHECK BATTERY POWER SUPPLY VOLTAGE
Disconnect IPDM E/R connector.
Check voltage between IPDM E/R harness connector and the ground.
+
-
Voltage
IPDM E/R
Connector
Terminal
E118
2
Ground
6 – 16 V
Is the inspection result normal?
Replace IPDM E/R. Refer to
Removal and Installation
.
Repair the battery power supply circuit.