[Previous][Next]
PURGE CONTROL SOLENOID VALVE CHECK
 
 
 
 
Operation check
1. Remove the vacuum hose from the evaporative emission purge solenoid.
2. Remove the evaporative emission purge solenoid from the inlet manifold.
3. Connect a hand vacuum pump to nipple (A) of the solenoid valve (refer to the illustration).
4. Check airtightness by applying vacuum with voltage applied directly from the battery to the solenoid valve and without applying voltage.
 
Battery voltageState of nipple BNormal condition
AppliedOpenedVacuum leaks
PluggedVacuum maintained
Not appliedOpenedVacuum maintained
 
 
 
Check coil resistance
1. Measure the resistance between the terminals of the solenoid valve.
Standard value: 22 – 26 Ω [at 20°C (68°F)]